Prosper Concrete Lifting logoProsper Concrete LiftingProsper, TX
Mudjacking photo

Prosper Concrete Lifting

Mudjacking in Prosper, TX

Mudjacking in Prosper, TX for sunken driveways and patios. Budget-friendly slab lifting, free written estimates.

  • 15+ Years local experience
  • 500+ Projects completed
  • Licensed & Insured

Serving Prosper and nearby communities.

Mudjacking is the classic method, and it's still the right call on a lot of the bigger driveway and patio pours across this area. Cement, sand, and soil pumped under a sunken slab, raised back to grade, holes patched. Straightforward.

Prosper Concrete Lifting runs mudjacking on jobs where budget matters and the slab size favors a heavier mix over foam. Larger patios in Paloma Creek and Providence Village subdivisions see this method often, especially where the drop covers a wide area rather than one small panel.

What's included

What's included with Mudjacking

Typically included: Optional: Customer prep:

  • Drilling pattern across the affected slab
  • Mud mix pumped and monitored during the lift
  • Raise to grade matching adjoining slabs
  • Hole patching and finish cleanup
  • Post-cure sealing
  • Additional joint work on driveway sections
  • Clear the work area of vehicles and outdoor furniture
  • Expect a short window before regular driving resumes

How it works

How our Mudjacking process works

  1. Assessment photo
    Step 1

    Assessment

    Measure the sunken area and plan drilling spots.

  2. Drilling holes photo
    Step 2

    Drilling holes

    Spaced for even mud distribution.

  3. Concrete Lifting Pumping mud mix photo
    Step 3

    Pumping mud mix

    Pressure-controlled to lift gradually.

  4. Raise and check photo
    Step 4

    Raise and check

    Slab brought level with neighbors.

  5. Patch and seal photo
    Step 5

    Patch and seal

    Holes filled, surface cleaned.

  6. Cure wait photo
    Step 6

    Cure wait

    Slab sets before full driving loads resume.

Timeline

How long does a Mudjacking take?

  1. 01

    Estimate visit

    same day
  2. 02

    Scheduling

    within a week

  3. 03

    Pumping and lift

    half day

    typical

  4. 04

    Cure before driving

    24–48 hours
  5. 05

    Follow-up check

    within a season

Need a schedule that fits?

Get a Free Estimate

Before & after

Before and after Mudjacking

  • Mudjacking photo
    Before
  • Mudjacking photo
    After

FAQs

Mudjacking FAQs

What's the difference between mudjacking and polyurethane injection?

Mudjacking uses a heavier cement-based mix, generally lower cost per square foot but slower to cure. Foam cures fast and weighs less, better for precision jobs.

How long does mudjacking take start to finish?

Most driveway sections are pumped and raised in half a day. Full cure before heavy driving runs another day or two.

Is mudjacking a good budget option?

It's usually the lower-cost path per square foot for larger sunken areas, though it needs more material by volume than foam.

Do I need a permit for mudjacking?

Standard driveway or patio mudjacking usually doesn't require one. Check with the town if the work touches a public sidewalk or structural foundation.

Can I mudjack my own driveway?

Pump pressure control matters here. Overpumping can crack a slab that was otherwise fine, that's the risk of DIY rental equipment.

Next step

Get a Mudjacking estimate in Prosper

Call (254) 268-3093 for a free estimate on your driveway or patio.

Ask about Mudjacking

Tell us about the project and how to reach you.

Call (254) 268-3093